| Project Name: | Status: | Project # |
| Central Disposal Site Blower Flare Project | Complete | W06939 |
|
Bid Date: May 28, 2008 at 2 PM Brief Description:The project shall include, in general, all work, materials, equipment, and incidentals necessary to furnish and construct a new blower flare station for the destruction of landfill gas from Sonoma County's Central Disposal Site at 500 Mecham Road, Petaluma, California, 94952. The project also includes (but is not limited to) limited site work and field and performance testing to provide a complete system ready for operation. A mandatory pre-bid site visit is scheduled for this project on April 30, 2008, commencing at 10:00 a.m. in the Conference room of the Operations Headquarters Building, Central Disposal Site, 500 Mecham Road, Petaluma, CA 94952. The County has determined that, to prepare a proper bid, bidders should observe existing conditions. | ||
|
||
| Project Name: | Status: | Project # |
| Central Landfill Leachate and Compressed Landfill Gas Pipeline Project (aka - Central Disposal Site Leachate Pipeline and Water Line Replacement Project) |
Complete | W06985 |
| Bid Opening: March 16, 2005 Brief Description: The work to be done consists, in general, of constructing approximately 24,000 linear feet of double-walled, high density polyethylene (HDPE) pipeline between the Central Disposal Site to the city of Rohnert Park sewage transmission line at Rohnert Park Expressway and Stony Point Road. Two pump stations will be constructed at the Central Disposal Site. Approximately 6,340 feet of existing 6-inch water line will be replaced with an 8-inch HDPE pipe. Any questions regarding
this project should be directed to Randy Forbes,
Project Manager, at the Central Landfill office (707)
565-7948. | ||
top of page2004 |
||
| Project Name: | Status: | Project# |
| Modification to the Existing Household Hazardous Waste Facility (Building V) at the Central Disposal Site | Complete | W06994 |
| Bid Opening: June 4, 2004 Brief Description: The work to be done consists, in general, of building modifications to an existing building. Any questions regarding this project should be directed to Dixon Haun, Senior Civil Engineer, at the Central Landfill office (707) 565-7940. |
||
top of page2003 |
||
| Project Name: | Status: | Project # |
| Central Landfill Site - East Canyon Expansion Phase IV | Complete |
W06887 (aka W06988) |
| Bid
Opening: June 25, 2003 Brief Description: The work to be done consists, in general, of constructing the next phase of the Central Landfill East Canyon Expansion Phase IV. The work will include approximately earth work, hard rock drilling and blasting, expansion of geosynthetic liner system, leachate collection system piping, drainage improvements, roadways, placement of sacrificial liner, and erosion control. |
||
|
||
top of page2002 |
||
| Project Name: | Status: | Project# |
| Central Disposal Site - East Canyon Expansion Phases I/II, Part 2 | Complete | W06888 |
| Bid Date: April 23, 2002 Brief Description: The work to be done consists, in general, of constructing the next phase of the Central Landfill East Canyon Expansion (Part 2 of Phases I/II). The Part 2 expansion lies immediately adjacent to the to-be-operating Part 1 area of the landfill. The work will include approximately 395,000 cubic yards of earth work, including approximately 35,000 cubic yards of hard rock drilling and blasting, expansion of ageosynthetic liner system, leachate and collection system piping, drainage improvements, roadways,abandonment of groundwater wells, and placement of erosion control. Per Addendum #1: The mandatory pre-bid meeting has been rescheduled for 10:00 a.m.,Tuesday, April 9, 2002 at the Central Landfill Headquarters Building, 500 Mecham Road, Petaluma, CA. Any questions regarding this project should be directed to Alex Sebastian,Civil Engineer, at the Central Landfill office (707)792-4961. |
||
|
||
| Project Name: | Status: | Project# |
| Central Disposal Site - Power Plant Expansion Phase III | Complete | W06990 |
| Bid Date: April 4, 2002 Brief Description: The work to be done consists, in general, of site development related to the future and separate contract for installing two 800 kW power generating modules. Site development will consist of grading and paving a roadway around the existing 6.0MW power plant, installing underground conduit banks and utilities to two separate foundations, excavating and placing the concrete foundations for two separate40-foot-long sea containers. Any questions regarding this project should be directed to Alex Sebastian,Civil Engineer, at the Central Landfill office (707)792-4961. |
||
|
||
top of page
2001 |
||
| Project Name: | Status: | Project# |
| RFP for Operated Equipment Rental Contract for Refuse Operations Division | Complete | RFP-R01 |
| BID Opening: NOVEMBER 28, 2001 Brief Description: *Note: This document is a Request for Proposal NOT an Invitation to Bid. The County is soliciting proposals to establish an Operated Equipment Rental Contract between the successful Contractor and the County of Sonoma. Contractor shall provide the County with the necessary equipment and operators as described in the RFP for the term of one (1) year, with two (2) additional one(1) year extensions if agreed upon by both the County of Sonoma and the Contractor. Work shall include but not be limited to: construction of drainage and sediment control facilities, landfill slopes,access roads, aprons, and leachate collection facilities. Primary location of work is the Central Landfill at 500 Mecham Road, Petaluma,CA. Any questions regarding this project should be directed to Susan Klassen,Refuse Operations Manager, at (707) 792-0547, or FAX(707) 792-0416. |
||