ADDENDUM NO. 3
I. Clarifications to various bid specifications and
requirements from questions received from contractors:
- The existing
trailer is to be disconnected from its current location
and relocated to another location on Airport property by
the Contractor. Final
location to be determined by Airport prior to relocation.
The existing awnings and ramps are to be dismantled and
scrapped.
- The existing
trailer is connected to the terminal building through
underground conduit to an existing 200 amp panel. The contractor is to disconnect the electrical
service lead from the existing unit and connect this
service feed to the proposed units electrical panel. If additional changes are required due to unknown field
conditions relating to the electrical feed, these changes
will be addressed through a change order.
- The
Contractor is to install the speakers for the PA system
and wiring to the backboard. All other equipment required for the Public Address
system will be installed by others.
Please
fill out "Noted Addenda" of the BID FORM,
Section 00300, page 1, verifying your receipt of this
Addendum.