Project Name: Hangar Sitework Preparation at Charles M. Schulz — Sonoma County Airport

Project # W09535

November 21, 2001

 NOTICE TO PLANHOLDERS
FOR CONSTRUCTION OF

HANGAR SITEWORK PREPARATION
AT
CHARLES M. SCHULZ--
SONOMA COUNTY AIRPORT

COUNTY PROJECT NO. W09535

ADDENDUM NO. 1

I. Changes to the Notice to Contractors (Bid Date) and Special Provisions:

    A. Page SP-1, Paragraph one (Bid Date) is revised to read:

Sealed bids will be received at the office of the Purchasing Agent, Suite A208, 2300 County Center Drive, Santa Rosa, California 95403 on Wednesday, December 12, 2001, until the hour of 2:00 p.m.

    B. Page SP-2, Engineer's Estimate, the following paragraph is added above the datatable:

The table below presents the Engineer's estimated construction quantities for the project. The Contractor is advised that these quantities are approximate, are presented for informational purposes only, and are to be independently verified by the Contractor is preparation of its lump sum bid proposal.

 The datatable is revised as follows:

ITEM NO.

ITEM DESCRIPTION

UNIT

QTY.

1

MOBILIZATION, BONDS, INSURANCE

LS

1.00

2

SITE PREPARATION AND EARTHWORK

CY

625.00

3

LIME TREATMENT, 18" DEPTH

SY

1,570.00

4

LIME TREATMENT, 30" DEPTH

SY

2,300.00

5

AGGREGATE BASE

CY

430.00

6

EROSION CONTROL MEASURES

LS

1.00

II. Changes to the Special Provisions:

A. Page SP-5, Section 3-1.01, "Award of Contract," paragraph 2 is changed to:

All bids will be compared on the basis of the Project Lump Sum Total of work to be done.

B. Page SP-12, Section 5-1.04, "Engineer's Estimate," subsection 1-1.19 is amended to read:

1-1.19 Engineer's Estimate -- The list of estimate quantities of work to be performed as contained in the "Notice to Contractors" under "Engineer's Estimate."

C. Page SP-14, Section 5-1.10, "Final Pay Quantities," subsection 9-1.015 is revised as follows:

The first paragraph is amended to read:

9-1.015 Final Pay Items -- If the dimensions of any portion of the item are significantly revised, and the revisions result in a significant increase or decrease in the estimated quantity of that item of work, the final pay quantity for the item will be revised in the amount represented by the changes in the dimensions. If a final pay item is eliminated, the estimated quantity for the item will be eliminated. If a portion of a final pay item is eliminated, the final pay quantity will be revised in the amount represented by the eliminated portion of the item of work.

The third paragraph is deleted.

D. Page SP-22, is amended by adding a new section 10-1.08, "Gate Security," as follows:

10-1.08 GATE SECURITY: The Contractor shall ensure that there are no unauthorized persons or vehicles entering the airport property through the contractor's access gate. At its option, the contractor shall lock the gate after each vehicle passes through the gate or provide a full-time security guard.

III. Changes to the Bidder's Book

A. Page BB-2, the first three paragraphs are revised to reflect a new "Lump Sum" bid per the following:

Bids are submitted for the entire work. The total amount of the bid for comparison purposes will be determined on the basis of the summation of all individual item lump sum prices to a "Project Lump Sum Total."

The Bidder shall set forth for each item of work, in clearly legible figures, a lump sum price of the item in the respective spaces provided for this purpose.

In case of discrepancy between the summation of individual item lump sum prices and the "Project Lump Sum Total," the summation of individual item lump sum prices shall prevail; provided, however, if the amount set forth as an item price is ambiguous, unintelligible or uncertain for any cause, or is omitted, then the amount set forth in the "Project Lump Sum Total" space shall prevail.

B. Pages BB-3 and BB-14, the Engineer's Estimate is revised to reflect the "Lump Sum" approach as follows:

ITEM
  NO.

ITEM DESCRIPTION

UNIT

QTY.

ITEM LUMP SUM PRICE

1

MOBILIZATION, BONDS, INSURANCE

LS

1.00

 

2

SITE PREPARATION AND EARTHWORK

LS

1.00

 

3

LIME TREATMENT, 18" DEPTH

LS

1.00

 

4

LIME TREATMENT, 30" DEPTH

LS

1.00

 

5

AGGREGATE BASE

LS

1.00

 

6

EROSION CONTROL MEASURES

LS

1.00

 

PROJECT LUMP SUM TOTAL

 

Note: Please insert the revised pages BB-2, BB-3 and BB-14 into the bid document when submitting your bid. The new bid amount now reflects a "Lump Sum" rather than a unit pricing approach.

C. Page BB-14, Article V., is amended as follows:

"And the said Contractor agrees to receive and accept the following lump sum prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage, arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or to be encountered in the prosecution of the work until its acceptance by the Department of Transportation and Public Works, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the plans and specifications and the requirements of the Engineer under them, to wit:"

IV. Changes to the Plans:

Plan Sheet 2 of 3 is replaced by the revised Plan Sheet 2 of 3.

V. Geotechnical Report: The relevant section referenced in the environmental monitoring is attached.

Please fill out the Addendum Acknowledgment sheet in the Proposal (page BB-4 of the Bidder's Book) verifying your receipt of this Addendum.

EDWARD J. WALKER, DIRECTOR
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

    Dave Knight                                    
Dave Knight
Deputy Director

Attachments:  Rev. BB-2, Rev. BB-3, and Rev. BB-14
                     Revised Plan Sheet 2 of 3
                     Geotechnical Report

 (The Attachments may be obtained from the Department of Transportation and Public Works)