| Project Name: Petaluma Transit Mall | Project # W07085 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
April 6, 2006 NOTICE TO PLANHOLDERS PETALUMA TRANSIT MALLCOUNTY PROJECT NO. W07085 ADDENDUM NO. 3 Item No. 1 Summary of Work B is a requirement of the project. Payment for the Health and Safety Plan will be considered to be included in the Mobilization Costs.Item No. 2 The Schedule of Bid Prices has been updated to include Hazardous Material items. Note new items 60, 61 and 62. Please replace Pages 2 and 3 of 5, Division I – Bid Form, Section 00400, of Volume 1 of 3 with the attached Add 3 Revised Bid Items Pages 2 and 3 of 5. Item No. 3 Section 10400 part 2.3 B is revised to include lighting per details on sheet A4. Item No. 4 Section 10400 part 2.3 B 3 is revised to: Back Panel: Aluminum with ¼ inch tackable overlay. Please fill out the Addendum section of the Bid Form [Division I, Section 00400, Page 1, 3(a)] (included in Volume 1 of 3) acknowledging receipt of this Addendum No. 3. DAVID D. KNIGHT, DIRECTOR Susan
R. Klassen (original signed) Attachment: Based on the foregoing, Bidder proposes and agrees to fully perform the Work within the time stated and in strict accordance with the Contract documents for the following sums of money listed in the following Schedule of Bid Prices: Schedule of Bid Prices All Bid items, including lump sums and unit prices, must be filled in completely. Bid items, Allowances and Alternatives are described in Section 01100 Summary of Work, paragraph 1.3. Quote in figures only, unless words are specifically requested. Abbreviations are as follows: “LS” for Lump Sum, “EA” for Each, “TN” for Ton(s), “CY” for Cubic Yard(s), and “FA” for Force Account.
*Basis to determine apparent low Bid. Total Bid Price (Words): SCHEDULE OF UNIT PRICES The previous Unit Prices shall apply to Work covered by unit prices. By submitting a Bid, Bidder acknowledges that these unit prices shall remain fixed throughout performance of the Contract, regardless of any incremental cost differentials resulting from variances in any quantity estimates or increased or decreased economies of scale. Total
Bid Price: 5. Subcontractors for work included in all Bid items are listed on the attached Document 00430 (Subcontractors List). 6. The undersigned Bidder understands that Owner reserves the right to reject this Bid. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||