| April
3, 2006
SONOMA COUNTY
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SANTA ROSA, CALIFORNIA
NOTICE TO PLANHOLDERS
FOR CONSTRUCTION OF
CANON
MANOR WEST ASSESSMENT DISTRICT IMPROVEMENTS
COUNTY PROJECT NOS. W06001, W06002, W06003
ADDENDUM
NO. 5
I. Changes to Plans and Special Provisions
Changes to Plans and Special Provisions as per
attached sheets.
Please
fill out the Addendum Acknowledgment sheet (page BB-9
of the Bidder's Book, Volume 1 of 3) verifying your
receipt of this Addendum (Addendum No. 5).
DAVID
D. KNIGHT, DIRECTOR
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
__John
Maitland________________
John Maitland, P.E.
Division Manager
Attached
Pages:
SCHEDULE A - PUMP STATION
Sheet
7 of 24
Delete Type C, D, & E trench section and trench
dimension chart.
Delete Backfill and bedding shown on Type A trench
section.
All backfill and bedding shall be per City of Rohnert
Park Standards
SCHEDULE A - TRUNK SEWER & FORCE MAIN
Sheet
17 of 20
The existing storm drain crossing the trunk sewer at
Sta 170+90 and Sta 174+75 is a 54” pipe.
The existing storm drain crossing the trunk sewer at
Sta 172+50 is a 18” pipe.
Sheet
1 of 20
Delete Note 22
“If a street has been cut to install utilities or to
match existing pavement, the street shall be slurry
sealed in accord with standard specifications of the
State of California Section 37-2. The extent of area to be sealed shall be
determined by the Superintendent of Public Works or
the City Inspector.”
Sheet
4 of 20
SSMH No. 1A shall be HDPE lined. Cost shall be included in Bid Item.
No. 16A 60” sewer manholes.
SCHEDULE B - SANITARY SEWER AND DRAINAGE IMPROVEMENTS
Sewers
and storm drains inside roadways shall be in
accordance with Rohnert Park Specifications.
Storm drains outside of roadway shall be bedded in
accordance with Rohnert Park Specifications; except
NATIVE MATERIAL IS ALLOWABLE above the bedding
Compacted to 90% RC.
Sheet
2 of 40
General Notes
Add: All
storm drain culverts noted on Sheet 4 and storm drain
noted as CL4 in profiles on Sheets 29 & 38 of 40
shall be RCP CL4.
All other storm drain shall be plastic.
Sheet
1 of 40
Clearing limits shall be as noted on typical section
and shall include clearing required for new driveways
noted on Driveway Table shown on sheet 4.
Existing trees 6” and greater to be removed are
noted on plans. All
trees, landscaping and improvements outside of the
clearing limits are to remain.
Landscaping, fences, irrigation systems and other
improvements inside of the clearing limits are not
required to be replaced.
SCHEDULE
C - WATER
MAIN PROJECT
Sheets
24, 25, 26, 27, 28 of 29
Sturtevant Drive
The lineal frontage of water MAINS shown represents
total length of pipe even though there may be slight
gaps in the match lines along the street.
Sheet
1 of 29
General Note 1
Add: Except as noted herein including backfill as
shown on sheet 29 of 29.
Sheet
29 of 29
Sampling tap shall be a curb stop installed inside a
standard single meter box.
BOOK
1 OF 3
Special
Conditions – Page SP 83
Utility boxes shall be for standard residential
utility splices.
Item
41B Utility Trench/conduit shall be standard
residential utility trench including conduits for
secondary electrical, telephone and gas only.
Item
43B Utility Trench Cap shall be 3’ wide x 3” thick
CDF including split conduit for telephone cables and a
3’ minimum length per crossing.
BOOK
2 OF 3
Section
2315
Delete Part 2 Products
All backfill in Schedule A shall be per Rohnert Park
Specifications
Delete
Section 3.3 Pipeline and Utility Trench Excavation.
ADDENDA
NO. 3
Detail
A referred to on page 4 of 19 Addenda No. 3 is
attached.


|