Project Name:  Porter Creek Road Slide Repair

Project # C02721

May 11, 2001

NOTICE TO ALL PLANHOLDERS
FEDERAL AID PROJECT - ER-3800(002)

FOR CONSTRUCTION OF

PORTER CREEK ROAD
(COUNTY ROAD NO. 8801B)
SLIDE REPAIR
POST MILE 17.24 TO P.M. 17.43
NET LENGTH 0.19 MILE

COUNTY PROJECT NO. C02721

ADDENDUM NO. 2

I.   Changes to the Contract Specifications:

     A.  Section 10-1.19A, "Surplus Material":  The last four paragraphs of Section 10-1.19A, "Surplus Material," are hereby deleted.

II.  Changes to the Plans:

     A.  Sheet 6
          For item 14, the station at the outlet of the reinforced concrete pipe (Station 21+35) changes to Station 21+36.

          For item 15, the quantity of the 12-inch plastic pipe changes to 28 linear feet.

     B.  Sheet 9
          For the Quantity Summary:

               Item 2, 12-inch plastic pipe, quantity changes to 16 linear feet.

               Item 15, 12-inch plastic pipe for cleanout, quantity changes to 28 linear feet.

               The total quantity for 12-inch plastic pipe changes to 241 linear feet.

Please fill out the Addendum Acknowledgment sheet (page BB-5 of the Bidder's Book) verifying your receipt of this Addendum (Addendum No. 2).

EDWARD J. WALKER, DIRECTOR
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

          John C. Leong                    
John C. Leong
Civil Engineer