Food Facility
Plan Review & Approval Procedure
Note: Please ensure the zoning
allows for the proposed use in the proposed location.
California Uniform Retail Food Facilities Law (CURFFL) requires
plan review prior to construction on all new or remodeled food facilities.
The following guidelines are based on CURFFL, which should be referred
to if there is need for clarification.
Plans will be reviewed within 20 working days of receipt by the Environmental
Health Division. If plans are not approved, a written notice will be
sent to the applicant detailing additional information needed. Upon completion
of plan review, plans will be returned to the applicant to be hand-carried
to the Building Department. A building permit cannot be issued
without plan review clearance from this Division.
All construction and operational aspects of your project must be completed
and approved by this Division prior to the issuance of the health permit.
Contact this office at least one week prior to your completion date for
a preliminary construction inspection. The following information is necessary
for timely review and approval:
- Fee
: Complete
and sign the clearance form and pay the required fee. This fee covers
time spent on plan review and construction inspections. If additional
time is spent on your project, a supplemental fee calculated at the
current hourly rate must be paid before the project can be finaled.
- Submit three sets of detailed plans and one set of specification
sheets.
- Scale: Plans shall be drawn to a minimum scale of ¼" =
1 foot. Identify each room or area on the plans.
- Site plan: Include dumpster pad and remote restrooms
if applicable.
- Floor plans: Submit plans of the entire facility,
including plumbing layout, electrical layout, reflected ceiling plan,
equipment layout details, and equipment elevations.
- Square footage: Provide square footage of food facility
and number of seats in dining room and bar.
- Equipment schedule: Include manufacturers' specification
sheets and the method of installation for all equipment; Food service
sinks must meet applicable NSF standards.
- Finish schedule: Specify materials and finishes
for floors, bases, walls, ceilings, shelving, and cabinets. This schedule
should include the type of material, the color, and the surface finish.
Give specific brand names. Samples or specifications of proposed finish
materials may be required. See handout: Flooring Requirements
for Food Establishments, available from this office.
- Hoods: Must be provided over all equipment that
produces heat, gases, smoke, or vapors. Refer to the current edition
of the Uniform Mechanical Code (UMC), Chapters 4 and 5, for requirements.
Complete an Exhaust Hood Worksheet for each separate hood that is proposed.
- Plumbing plan: Show complete plumbing layout (include grease
trap) and water heater locations. Floor
sinks must be accessible for cleaning and installed flush with
the floor finish. Include specification sheets for all food service
sinks. All food service sinks must meet NSF standards.
- Restrooms: Must be provided for use by employees.
The fixture requirements are found in the Uniform Plumbing Code (UPC).
Food establishments within a retail shopping center need not provide
toilet facilities within their boundaries if public restrooms are located
within 300 feet of the food establishment.
- Water
heater: Specify size and output in BTU/hour of the
water heater. If fixtures are located more than 60 feet from the
water heater, a recirculation pump must be installed. See Hot
Water Demands Worksheet available from this office for additional
requirements.
- Handwash sink: A sink to be used exclusively for
handwashing with hot and cold water must be provided within each food
preparation area and equipped with mounted soap and towel dispensers.
- Utensil washing: A three-compartment stainless steel
sink with dual integral drain boards is required if utensils are to
be washed. The sink must be capable of accommodating the largest utensil
to be washed. Each drain board shall be as large as the sink compartments.
The three-compartment sink must drain to a floor
sink.
- Dishwashing: Where reusable customer utensils are
used, provide a three-compartment stainless steel sink with dual integral
drain boards or a dishwasher that meets NSF standards.
- Food preparation sink: Establishments needing a
separate sink for food preparation such as thawing, rinsing, or soaking
shall have a stainless steel sink that meets NSF standards. The food
preparation sink must drain to a floor
sink.
- Mop sink: Provide an approved janitorial sink with
hot and cold water and backflow protection. Submit a specification
sheet. The sink shall be located to prevent contamination of any food
preparation areas, food storage areas, utensils, or equipment. A wall
or enclosure may be required depending on location of the mop sink.
Provide space for storage of a mop bucket and cleaning supplies. A
curbed utility wash down area may be used in lieu of a mop sink.
- Grease
trap: Provide location and size. Check with the local
public works department for requirements.
- Menu: Submit a menu or list of foods to be prepared
in the food facility.
- Sneeze
guards: Provide complete scale drawings and finish
schedule of each sneeze guard.
- Employee clothes storage: A Room, enclosure, or
designated area separated from toilets, food storage, food preparation
areas and utensil washing areas must be provided where employees may
change and store clothes. Establishments with fewer than ten (10) employees
per shift can meet this requirement by providing employee lockers or
similar cabinets.
- Storeroom: The required floor area of the storeroom
shall be determined as 25% of the kitchen area or 1 square foot per
seat, whichever is greater. This area must include cleanable metal
shelves. Shelves must be located to allow for 6" of clear space
between the floor and the bottom shelf.
- Lighting: Shatterproof shields are required on lights
above food preparation areas, utensil washing areas, and where open
food is stored. In areas where food is prepared or utensils are washed,
lighting of at least 20 foot-candles is required.
- Dumpster area: A dumpster pad and enclosure are
required. Check with the building department for requirements.
- Water supply: The water supply shall be from a water
system approved by the Health Officer or the State Health Department.
A water supply permit may be required.
- Sewage disposal: The establishment must be connected
to a municipal sewer system or an individual sewage disposal system.
If the operation is to be served by an individual sewage disposal system,
contact the Sonoma County Permit and Resource Management Department
for current requirements, phone (707) 527-1900.